In November 2020 RM Minings had contracted a Turkish company Pozitif Sondaj (http://pozitifsondaj.com.tr) to execute the first stage of the drilling program. In the scope of the exploration program 10 holes were drilled (~480 m total length) with the depth variance between 20 m to 100 m.
